煤仓层两个MCC电源接自厂用400V()段,#6甲乙带动力电源接自厂用400V()段

题型:填空题

问题:

煤仓层两个MCC电源接自厂用400V()段,#6甲乙带动力电源接自厂用400V()段。

考点:电厂燃料输煤考试电厂燃料输煤考试题库
题型:填空题

给加粗的字选择正确的读音,打上“√”。

1.弟弟也(jiǎ  jià)装打哈欠,把蒲公英的绒毛(cháo  zhāo)我脸上吹。

2.它和我们一起睡(jué  jiào),和我们一起起床。

3.我(fā  fà)现草地并不是金色的,而是绿色的。

4.从那时起,蒲公英成了我们最喜爱的一(zhǒng  zhòng)花。

题型:填空题

对于未予函证的应收帐款,应当执行的最有效的审计程序是()

A.重新测试相关的内部控制制度

B.审查与应收帐款有关的销货凭证

C.进行分析程序

D.审查资产负债表日后的收款情况

题型:填空题

In the following essay, each blank has four choices. Choose the best answer and write down on the answer sheet.

The purpose of the testing phase of software development is not to (1) the absence of errors in the programs being tested, but rather to find as many errors as possible. This statement may seem to contradict one’s intuitive notion of a successful test of a piece of (2) ; however, a successful test is one in which errors have been found, net one in which no errors have been detected.

There are generally two kinds of testing method: human testing and machine testing. In most companies where systems are developed, the first testing that occurs is not machine testing, but rather the detection of errors through (3) , team efforts, referred to as walkthroughs and inspection. With these methods, the author of the program forms a group with others who represent programming expertise or who may be part of the project team.

After code has been subjected to the manual testing described above, it is then machine test- ed. Again, the test cases are designed to detect the (4) number of errors. Incremental or integration testing occurs subsequent to unit testing. This means combing modules with those that have already been unit tested. The incremental approach not only tests the (5) of each module, but also the "rippling effects" of errors, and the interfaces among modules.

3()

A.personal

B.machine

C.manual

D.tester

题型:填空题

财税库银横向联网系统中心设立在()。

题型:填空题

TD-SCDMA的中文含义为()。

A、时分同步频分多址接入

B、频分同步码分多址接入

C、时分同步码分多址接入

D、频分同步时分多址接入

更多题库