锅炉过热器水压试验,汽机应做哪些安措?

题型:问答题 简答题

问题:

锅炉过热器水压试验,汽机应做哪些安措?

考点:集控值班员考试汽机运行汽机运行题库
题型:问答题 简答题

In the dining room of my grandfather’s house stood his heavy dock. Meals in the dining room were a (16) for our four generations to become one. My grandfather’s clock always stood like a trusted old family friend, (17) us playing jokes and telling stories, which was already a (18) of our life.
When I was a child, the old clock interested me. I watched and listened to it during (19) I was surprised how at (20) times of the day, the clock would strike three times, six times or more, with a wonderful great (21) that echoed throughout the house. The clock chimed year after year, a part of my (22) , a part of my heart.
Even more (23) to me was my grandfather’s special action each day. He meticulously (24) the clock with a special key each day. The key was magic to me. It (25) our family’s magnificent clock ticking and striking all year round.

Ⅱ.完型填空/Cloze

A.busy

B.urgent

C.happy

D.different

题型:问答题 简答题

FOB吊钩下交货由买(卖)方将货物交到买方指定船舶的吊钩所及之处,从货物吊装开始装货费用由买方负担。()

题型:问答题 简答题

M元素的一个原子失去2个电子,该2个电子转移到Y元素的两个原子中形成离子化合物Z。下列说法正确的是 [ ]

A.Z的熔点较低

B.Z可以表示为M2Y

C.Z-定熔于水

D.M形成+2价阳离子

题型:问答题 简答题

提供社区就业服务的主要有镇、街道的劳动保障事务所和就业援助员。

题型:问答题 简答题

某建筑公司地某年3月10日与某建设单位签订一工程施工合同。合同中有关工程价款及其交付的条款摘要如下:
(1)合同总价为600万元,其中工程主要材料和结构件总值占合同总价的60%。
(2)预付备料款为合同总价的25%,于3月20日前拨付给乙方。
(3)工程进度款由乙方逐月(每月末)申报,经审核后下月5日前支付。
(4)工程竣工并交付竣工结算报告后30日内,支付工程总价款的95%,留5%作为工程保修金,保修期(半年)满后全部结清。合同中有关工程工期的规定为:4月1日开工,9月加日竣工。工程款逾期支付,按每日3%。的利率计息。逾期竣工,按每日1000元罚款。根据经甲方代表批准的施工进度,各月计划完成产值(合同价)如表所示。
表 某工程各月计划完成产值 单位:万元

月份 4 5 6 7 8 9         
完成产值 80 100 120 110 100 80
在工程施工至8月16日,因施工设备出现故障停工两天,造成窝工50工日(每工日工资 19.50元),8月份实际完成产值比原计划少3万元;工程施工至9月6日,因甲方提供的某种室外饰面板材质量不合格,粘贴后效果差,甲方决定更换板材,造成拆除用工60工日(每日工资 23.50元),机械多闲置3个台班(每台班按400元计),预算外材料费损失2万元,其他费用损失1万元,重新粘贴预算价10万元,因拆除、重新粘贴使工期延长6天。最终工程于9月29日竣工。
问题1.请按原施工进度计划,为甲方提供一份完整的逐月拨款计划。
(2)乙方分别于8月20日和9月20日提出延长工期2天,索赔费1092元和延长工期6天,索赔费162070.00元。请问该两项索赔能否成立应批准的工期延长为几天索赔费为多少万元
(3)8月份和9月份乙主应申报的工程结算款分别为多少