算法指的是 (31) 。 A.计算机程序 B.解决问题的计算方法 C.排序算法 D.

题型:单项选择题

问题:

算法指的是 (31)

A.计算机程序

B.解决问题的计算方法

C.排序算法

D.解决问题的有限运算序列

考点:计算机软件水平考试初级程序员初级程序员上午试题
题型:单项选择题

As we know, Meizhou Island is a famous place of interest in Putian. My pen pal from Australia, Sam, would like to visit it very much. He is coming here for a holiday next week. He is planning to stay here for seven days. He has never come to Putian before, so he needs to know something about it. The weather is the most important thing that he would like to know. He wants to know what he should get ready for the trip and what kinds of clothes he has to take with him. Here is the seven-day weather report for Putian.

根据短文及表格内容,从题中所给的A、B、C、D四个选项中,选出最佳答案。(10分)

小题1:How long will Sam stay in Putian?

A.Two days.

B.Five days.

C.A week.

D.A month.小题2:What information does Sam most want to know?

A.The food in Putian.

B.The history of Putian.

C.The traffic in Putian.

D.The weather in Putian.小题3:What will the weather be like on July 5th?

A.Sunny.

B.Cloudy.

C.Windy.

D.Rainy.小题4:On July 3rd, the high temperature is________.

A. 26C. B. 28 C. 32 D. 36C.

小题5:What do you think Sam should wear when he stays in Putian?

题型:单项选择题

建筑标准设计图有各地的和全国通用的,对建筑的施工图设计阶段有较大的帮助。它的主要内容是()。

题型:单项选择题

某工程业主与承包商签订了工程施工承包合同。合同工期5个月,工程量预估为10000m3,合同单价为100元/m3。预付款30%,从第一个月起每月等比例扣除。工程保留金按工程进度款的5%逐月扣留,监理工程师每月签发进度款的最低限额为10万元(且为整数万元),不足10万元转入下月。计划每个月匀速施工,但第1个月、第2个月实际完成的工程量分别为1600m3和2000m3。合同约定:当累计实际完成工程量超过(或低于)估算工程工程量的10%时,可进行调价,调价系数为0.9(或1.1)。工程竣工时,经工程师计量累计完成工程量为13000m3。为有效控制成本,该工程每月进行成本分析。
根据材料,回答以下问题:

实际工程价款是( )万元。

A.132
B.128
C.127
D.117

题型:单项选择题

人口总数是()。

A.流量 

B.存量 

C.既是流量又是存量 

D.既不是流量也不是存量

题型:单项选择题

进行交易时,POS显示“商户未登记”,其原因是()

A、银行后台主机未建POS的参数

B、流水号重复

C、POS机具故障

D、银行后台主机未开机

更多题库