给排水构筑物正确的施工顺序是()。 A.主体附属不分先后 B.先地上后地下 C.先土

题型:单项选择题

问题:

给排水构筑物正确的施工顺序是()。

A.主体附属不分先后

B.先地上后地下

C.先土建后设备

考点:市政公用工程继续教育市政公用工程继续教育题库
题型:单项选择题
( )
8
=3:4=36÷______=______%
题型:单项选择题

信用证内容
+27: SEQUENCE OF TOTAL 1/1
+40A: FORM OF DOCUMENTARY CREDIT IRREVOCABLE
+20: DOCUMENTARY CREDIT NUMBER CA54688/BCA
31C: DATE OF ISSUE080111
+40E: APPLICABLE RULES UCP LATEST VERSION
+31D: DATE AND PLACE OF EXPIRY 080302 BENEFICIARY’SCOUNTRY
+50: APPLICANT GREEN TIMBERS INT PTY UMITED 12 HELY
PLACE MT OMMANEY, BRISBANE DAL
6710, AUSTRALIA
+59: BENEFICIARY ZHEJIANG FORTUNE LAND CO., LTD.
1125 YANCHANG ROAD
NINGBO ZHEJIANG CHINA
+32B: CURRENCY CODE, AMOUNT: USD227106
39A: PERCENTAGE CREDIT AMOUNT TOLERANCE 10/10
+41D: AVAILABLE WITH. BY.ANY BANK BY NEGOTIATION
42C: DRAFTS AT. SIGHT FOR 100 PCT OF INVOICE VALUE
43P: PARTIAL SHIPMENTS NOT ALLOWED
43T: TRANSSHIPMENTNOT ALLOWED
44E: PORT OF LOADINC/AIRPORT OF DEPARTURENINGBO PORT CHINA
44F: PORT OF DISCHARGE/AIRPORT OF DESTINATION BRISBANE, AUSTRALIA
44C: LATEST DATE OF SHIPMENT 080215
45A: DESCRIPTION OF GOODS AND/OR SERVICES
ABOUT 740 CBM OF FULL COMBI CORE (5 LAYER RED HANDWOOD AND 6 LAYER WHITE POPLAR CORE) AT USD 279 PER CBM SPECIFICATION 1200×2440×18 MM THICKNESS TOLERANCE
PLUS OR MINUS 0.5MM
FOB NINGBO, CHINA
SHIPPING TERMS: FOB NINGBO, CHINA
46A: DOCUMENTS REQUIRED
(1)PORT-TO-PORT BILL OF LANDING IN 3 OF 3 ORIGINALS AND 1 NON-NEGOTIABLE COPYAND MARKED "FREIGHT COLLECT" AND NOTIFY: APPLICANT.
(2)SIGNED ORIGINAL COMMERCIAL INVOICE IN TRIPLICATE.
(3)CERTIFTCATE OF ORIGINAL ISSUED BY CHAMBER OF COMMERCE OR COMPETENT AUTHORITY IN COUNTRY OF ORIGIN.
(4)DETAILED PACKINC UST.
(5) COPIES OF ALL DOCUMENTS TO BE SENT BY COURIER TO THE APPLICANT WITHIN EIGHT
DAYS OF SHIPMENT DATE AND COPY OF COURIER RECEIPT TO ACCOMPANY DOCUMENTS FOR NEGOTIATION.
47A: ADDITIONAL CONDITION
(1)ISSUING BANK CHARGES ARE FOR ACCOUNT OF APPLICANT. ALL EXPENSES OUTSIDE AUSTRALIA ARE FOR THE ACCOUNT OF THE BENEFICIARY.
(2) ALL DOCUMENTS SHOULD BE IN ENGUSH.
(3)ALL DOCUMENTS INCLUDING BILIS OF LADING MUST NOT BE DATED PRIOR TO THIS LETTER OF CREDIT.
71B: CHARGES
ALL CHARGES OF BANKS 0UTSIDE AUSTRALIA ARE FOR THE ACCOUNT OF BENEFICIARY.
48: PERIOD FOR PRESENTATION
DOCUMENTS TO BE PRESENTED WITHIN 15 DAYS AFTER SHIPMENT DATE BUT WITHIN THE VALIDITY OF THIS CREDIT.
+49: CONFIRMATION INSTRUCTIONS WITHOUT
78: INSTRUCTIONS TO THE PAYING/ACCEPTING/NEGOTIATING BANK
REIMBURSEMENT INSTRUCTIONS TO THE NEGOTATING BANK: UPON RECEIPT OF DOCUMENTS IN CONFORMITY WITH THE CREDIT TERMS, THE ISSUING BANK SHALL REMITPROCEEDS BY TELEGRAPHIC TRANSFER IN ACCORDANCE WITH YOUR INSTRUCTIONS.
57D: SENDER TO RECEIVER INFORMATION
BANK OF COMMUNICATIONS NINGBO BRANCH, CHINA.
(2)根据信用证内容回答下列问题:

该信用证中规定的适用规则为( )。

A.“EUCP LATEST VERSION”(电子化交单统一惯例最新版本)

B.“UCP URR LATEST VERSION”(统一惯例及偿付统一规则最新版本)

C.“UCP LATEST VERSION”(统一惯例最新版本)

题型:单项选择题

家畜类内脏原料常用的清洗加工方法是:______。

A.里外翻洗法、盐醋搓洗法、热水烫洗法、刮剥洗涤法、灌水冲洗法、清水漂洗法

B.削皮清洗法、里外翻洗法、刮剥洗涤法、摘除油膜法、灌水冲洗法、清水漂洗法

C.去瓤淘洗法、里外翻洗法、去除黏液法、刮剥洗涤法、酸碱中和法、灌水冲洗法

D.去除杂质法、盐醋搓洗法、热水烫洗法、剥皮清洗法、去沙淘洗法、灌酒去腥法

题型:单项选择题

(),工信部正式发布3G牌照,中国移动同步发布中国移动3G标识G3。

A、2009年1月1日

B、2009年1月7日

C、2009年1月30日

D、2010年1月7日

题型:单项选择题

钢轨组可放在道心或枕木头上并进行固定。钢轨组放在道心时,新轨组外侧距线路上钢轨作业边不得小于()。

A、100mm

B、150mm

C、200mm

D、300mm

更多题库