下令将元中都废为行宫的元朝皇帝是()。 A.元世祖 B.元仁宗 C.元武宗 D.元英

题型:单项选择题

问题:

下令将元中都废为行宫的元朝皇帝是()。

A.元世祖

B.元仁宗

C.元武宗

D.元英宗

考点:导游基础知识导游基础知识题库
题型:单项选择题

《备急千金要方》成书于()

A.唐代

B.宋代

C.元代

D.明代

E.清代

题型:单项选择题
李永村计划修一条长30千米的柏油路,第一周修了
1
5
,第二周修了
2
3
,第三周还要修多少千米才能按期完成任务?
题型:单项选择题

以下有关长直载流导线所产生磁场的说法正确的有()

A.长直载流导线周围磁力线的形状不是同心圆

B.用右手螺旋定则判定长直载流导线产生的磁场方向

C.离导线越远,磁力线分布越疏

D.长直载流导线周围磁力线的形状是环绕导线的同心圆

题型:单项选择题

如果x公司没有损失,对X公司要求合伙企业支付全部违约金的主张,合伙企业可否提出异议

题型:单项选择题

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(2)处应选择()

A.activity

B.procedure

C.process

D.progress

更多题库