The PM and the project team have completed

题型:单项选择题

问题:

The PM and the project team have completed decomposition and have verified scope, when the marking department makes a minor change to the product functionality to improve its appeal to the end customer. The PM and the project team ______ .

A) refuses to accept the change since the scope has been verified
B) modifies the WBS and the decomposition
C) accepts the change and incorporates it into the WBS, modifying the budget and the schedule and assigning accountability to the marking team
D) proceeds per the change process

考点:自学考试法学类PMP资格认证考试
题型:单项选择题

I climbed the stairs slowly with a big suitcase, my father         with two more.

A.followed

B.was following

C.following

D.having following

题型:单项选择题

Elle craint de ____________ l' épaule dans sa chute.

A.s'être démis

B.s'être rendu compte

C.s'être laissée

D.s'être expliquée

题型:单项选择题

混凝土质量配合比为水泥:砂:碎石=1:2.13:4.31,W/C=0.58,水泥用量为310kg/m3,1立方米混凝土中含石()kg。

A.1356 

B.1366 

C.1363  

D.1336 

题型:单项选择题

佗脉之日()

A.宾语前置

B.为动用法

C.使动用法

D.意动用法

E.被动句

题型:单项选择题

以下哪些类是物联网的应用模式()

A.政府客户的数据采集和动态监测类应用

B.行业或企业客户的数据采集和动态监测类应用

C.行业或企业客户的购买数据分析类应用

D.个人用户的智能控制类应用

更多题库