某施工企业通过投标获得了某机电安装工程的施工总承包任务,该施工企业中标后的第10天

题型:问答题

问题:

某施工企业通过投标获得了某机电安装工程的施工总承包任务,该施工企业中标后的第10天与业主签订了固定总价机电安装施工总承包合同。随后,该施工企业将部分主体工程分包给具有相应资质条件的分包人,并签订了分包合同。施工总承包合同中约定的合同工期为380天,而依施工预算定额该工程工期应为360d。在合同履行过程中,施工总承包单位发现施工图设计文件中提供的某些工程尺寸有误,遂提出更正。
问题

该工程的实际工期为多少天为什么

考点:二级建造师机电工程机电工程管理与实务
题型:问答题
阅读理解。
    That cold January night, I was growing sick of my life in San Francisco. There I was, walking home at one
in the morning after a tiring practice at the theatre. With the first performance only a week   1  , I was still
learning my lines. I was having   2   dealing with my part-time job at the bank and my acting at night at the
same time.
     As I walked, I thought seriously about   3   up both acting and San Francisco. City life had become too
much for me. As I walked down   4   streets under tall buildings, I felt very small and cold. I began running,
both to keep   5   and to keep away from any possible   6   . Very few people were still out except a few
sad-looking homeless people under blankets.
     About a block from my apartment, I heard a sound behind me. I   7   quickly, half   8   to see someone
with a knife or a gun. The street was empty. All I saw was a shining streetlight. Still, the noise had made me
  9  , so I started to run faster. Not until I reached my apartment building and unlocked the door did I realize 
  10   the noise had been. It had been my  11  falling to the sidewalk.
     Suddenly I wasn't cold or tired anymore. I ran out of the door and back to   12   I'd heard the noise.
Although I   13   the sidewalk anxiously for fifteen minutes, my wallet was  14  to be found.
     I was about to give up the search when I heard the garbage truck pull up to the sidewalk next to me. When
a voice called from the   15   ,"Alisa Camacho?" I thought I was  16   . How could this man know my name?
The door opened, and out jumped a small red-haired man with an amused look in his eyes."Is this what you're
looking for?" he asked,   17   up a small square shape.
      It was nearly 3 a.m. by the time I got into bed. I wouldn't get much   18   that night, but I had gotten my
wallet back. I also had gotten back some   19   of city life. I realized that the city couldn't be a bad place as
long as people were   20   to help each other.
( )1. A. ago        
( )2. A. fun        
( )3. A. giving     
( )4. A. narrow   
( )5. A. warm      
( )6. A. pickpockets
( )7. A. ran        
( )8. A. meaning    
( )9. A. sad        
( )10. A. what      
( )11. A. wallet    
( )12. A. when      
( )13. A. looked for
( )14. A. somewhere  
( )15. A. outside    
( )16. A. drinking  
( )17. A. bringing   
( )18. A. money     
( )19. A. enjoyment  
( )20. A. pleased    
B. before      
B. trouble     
B. keeping    
B. dirty       
B. hot          
B. murderers   
B. turned     
B. wanting     
B. nervous      
B. how         
B. watch     
B. where       
B. found     
B. nowhere     
B. inside       
B. dreaming  
B. taking      
B. sleep       
B. sadness     
B. anxious    
C. away         
C. interest      
C. going        
C. empty         
C. cold              
C. policemen  
C. walked     
C. expecting     
C. cold         
C. why            
C. hat         
C. at which       
C. searched     
C. anywhere      
C. behind        
C. sleeping    
C. holding       
C. happiness     
C. puzzle        
C. willing    
D. off                    
D. boredom                
D. clearing               
D. dark                   
D. cool                     
D. robbers                
D. looked               
D. hoping                 
D. happy                  
D. which                   
D. key                    
D. which                    
D. headed                
D. everywhere            
D. above                    
D. walking              
D. keeping                
D. practice                 
D. disappointment          
D. content           
题型:问答题

下列哪个不属于球蛋白()。

A.IgG

B.IgM

C.补体C3

D.因子Ⅷ

E.抗球蛋白

题型:问答题

对日贸易三原则

题型:问答题

在锅炉起动过程中,对水位的监视应以()为准。

A、一次水位计

B、二次水位计

C、任何水位计都可

题型:问答题

根据我国海上运输货物保险条款规定,“提货不着”是指( )。

A.承运人在目的地未能提取整件货物或全部货物
B.发货人在目的地未能提取整件货物或全部货物
C.保险人在目的地未能提取整件货物或全部货物
D.收货人在目的地未能提取整件货物或全部货物

更多题库