The deck control valve to be()after being
问题:
The deck control valve to be()after being repaired.
A.moved and fitted again
B.removed and refitted
C.reproduced and put on again
D.returned and attached again
The deck control valve to be()after being repaired.
A.moved and fitted again
B.removed and refitted
C.reproduced and put on again
D.returned and attached again