水泵小修不包括()。A、更换轴套 B、更换平衡盘 C、更换密封环 D、更换传动轴

题型:单项选择题

问题:

水泵小修不包括()。

A、更换轴套

B、更换平衡盘

C、更换密封环

D、更换传动轴

考点:矿井泵工矿井泵工题库
题型:单项选择题

某种植物的主干长出若干数目的枝干,每个枝干又长出同样数目的小分支,主干、枝干和小分支的总数是91,每个枝干长出多少小分支?

题型:单项选择题

Photoshop中利用橡皮擦工具擦除背景层中的对象,被擦除区域填充什么颜色? ( )

A.黑色

B.白色

C.透明

D.背景色

题型:单项选择题

利率的变动会影响总需求,进而影响均衡国民收入。

题型:单项选择题

下列哪一项不是危机期间与媒体互动的原则()

A.减少信息

B.坦诚诚实

C.实事求是

D.主动回复

题型:单项选择题

In the following essay, each blank has four choices. Choose the best answer and write down on the answer sheet.
The purpose of the testing phase of software development is not to (21) the absence of errors in the programs being tested, but rather to find as many errors as possible. This statement may seem to contradict one’s intuitive notion of a successful test of a piece of (22) ; however, a successful test is one in which errors have been found, net one in which no errors have been detected.
There are generally two kinds of testing method: human testing and machine testing. In most companies where systems are developed, the first testing that occurs is not machine testing, but rather the detection of errors through (23) , team efforts, referred to as walkthroughs and inspection. With these methods, the author of the program forms a group with others who represent programming expertise or who may be part of the project team.
After code has been subjected to the manual testing described above, it is then machine test- ed. Again, the test cases are designed to detect the (24) number of errors. Incremental or integration testing occurs subsequent to unit testing. This means combing modules with those that have already been unit tested. The incremental approach not only tests the (25) of each module, but also the "rippling effects" of errors, and the interfaces among modules.

A) logic B) content C) code D) physical

更多题库