建设工程在可调价格合同条件下,发生通货膨胀风险事件,则( )。 A.业主不存在风险 发布时间:2018-01-08 18:02 │ 来源:www.tikuol.com 题型:单项选择题 问题: 建设工程在可调价格合同条件下,发生通货膨胀风险事件,则( )。A.业主不存在风险 B.业主的风险很大C.承包商的风险很大 D.承包商不存在风险
题型:单项选择题 In order for the automatic lifeboat drain to operate properly().A.the cap should be removed to drain the boat when it is waterborneB.the cage must be free of rubbish or the ball may not seat properlyC.there is an automatic ball check located in a siphon tubeD.the small lever to release the rubber ball float must be turned counterclockwise 查看答案