软件设计包括软件的结构、数据接口和过程设计,其中软件的过程设计是指______。A.

题型:单项选择题

问题:

软件设计包括软件的结构、数据接口和过程设计,其中软件的过程设计是指______。

A.模块间的关系

B.系统结构部件转换成软件的过程描述

C.软件层次结构

D.软件开发过程

考点:计算机等级考试ACCESS二级ACCESS笔试
题型:单项选择题

按钻孔单位涌水量大小,含水层富水性分为哪四种?

题型:单项选择题

当代国际关系错综复杂,各国处理国际关系时,最主要的是________决定自己的态度和对策。[ ]

A、按照国际条约

B、根据国家利益

C、按照联合国的决议

D、根据大国一致原则

题型:单项选择题

评价中心具有哪些特点?

题型:单项选择题

Flow control is a function that prevents network congestion by ensuring that (66) do not over-whelm (67) with data. There are three commonly used methods for handling network congestion. (68) is used by network devices to temporarily store bursts of excess data in memory until they can be processed. (69) are used by receiving devices to help prevent their buffers from overflowing. (70) is a flow-control scheme in which the source device requires an acknowledgment from the destination after a certain number of packets have been transmitted.

(70)是()

A. Buffer

B. Source-quench messages

C. window

D. Windowing

E. Buffering

题型:单项选择题

某安装公司总包氮氢压缩分厂的全部机电安装工程,其中氮氢压缩机为多段活塞式,工作压力为32MPa,电机与压缩机本体分两件进场,现场用齿式联轴器连接。压缩机系统的管道随机组订货,现场组装试验。

开工前,安装公司决定压缩机系统的机械设备、电气自动化、管道等主体工程由本单位自行安装,防腐保温及其他非主体工程分包给具有相应资质的分包单位承担。安装公司对分包工程从技术、质量、安全、进度、工程款支付等进行施工全过程的管理。

施工前,施工方案编制人员向施工作业人员作了分项、专项工程的施工方案交底,由于交底内容全面、重点突出、可操作性强,故施工中效果明显,工程进展顺利。

试运行阶段,一台压缩机振动较大,经复查土建无施工质量问题,基础无下沉;设备制造质量全部合格;复查安装记录,垫铁设置合理且按规定定位焊接,一、二次灌浆均符合质量要求,测量仪器精度合格,各种环境因素对安装无影响。建设单位要求安装公司进一步认真复查并处理。

对分包工程管理的主要依据有哪些?