电子计数器一般由输入电路、逻辑控制电路()、()和计数显示电路等基本单元电路组成。

题型:填空题

问题:

电子计数器一般由输入电路、逻辑控制电路()、()和计数显示电路等基本单元电路组成。

考点:无线电装接工考试中级无线电装接工中级无线电装接工题库
题型:填空题

标出下列物质中加点元素或画线原子团的化合价:

N
2______、______S______、Cu2____________、Fe______3______、K2____________、NH4Cl______、NaClO______.

题型:填空题

2005年12月底,中国南极科考队第22次到达南极洲.为保护南极洲的环境,南极洲的考察只限于(  )

A.环境目的

B.科研目的

C.和平目的

D.生态目的

题型:填空题

关于卵巢周期下述哪项不正确

A.颗粒细胞是由始基卵泡的菱形细胞变来的

B.每一个始基卵泡中含有一个卵母细胞

C.卵泡内外膜细胞都是由卵巢皮质层的间质细胞衍化而来的

D.放射冠是由直接围绕卵母细胞的卵泡内膜细胞构成

E.卵泡膜黄体细胞是由卵泡内膜细胞衍化而来

题型:填空题

In the following essay, each blank has four choices. Choose the best answer and write down on the answer sheet.

The purpose of the testing phase of software development is not to (1) the absence of errors in the programs being tested, but rather to find as many errors as possible. This statement may seem to contradict one’s intuitive notion of a successful test of a piece of (2) ; however, a successful test is one in which errors have been found, net one in which no errors have been detected.

There are generally two kinds of testing method: human testing and machine testing. In most companies where systems are developed, the first testing that occurs is not machine testing, but rather the detection of errors through (3) , team efforts, referred to as walkthroughs and inspection. With these methods, the author of the program forms a group with others who represent programming expertise or who may be part of the project team.

After code has been subjected to the manual testing described above, it is then machine test- ed. Again, the test cases are designed to detect the (4) number of errors. Incremental or integration testing occurs subsequent to unit testing. This means combing modules with those that have already been unit tested. The incremental approach not only tests the (5) of each module, but also the "rippling effects" of errors, and the interfaces among modules.

5()

A.logic

B.content

C.code

D.physical

题型:填空题

当事人对仲裁协议的效力有异议的,应当在何时提出?()

A.申请仲裁之时

B.仲裁庭首次开庭之前

C.仲裁裁决作出之前

D.仲裁程序终结之前

更多题库