直肠癌生长绕直肠一周需多长时间() A.3~6个月 B.6~12个月 C.12~18

题型:单项选择题 A1型题

问题:

直肠癌生长绕直肠一周需多长时间()

A.3~6个月

B.6~12个月

C.12~18个月

D.18~24个月

E.24个月以上

考点:整形外科主治医师普通外科学普通外科学题库
题型:单项选择题 A1型题

以下关于蛛网膜下腔麻醉后头痛的叙述正确的是()

A.原因是术中出血多所致

B.症状多不能自行缓解

C.常发生在术后病人第一次抬头或起床活动时

D.因脑脊液外漏致颅内压增高

E.一般持续时间在一周以上

题型:单项选择题 A1型题

这个标志的含义是提醒前方两侧行车道或路面变窄。

题型:单项选择题 A1型题

按照我国参加的条约或互惠原则,外国当事人向我国法院提出司法协助请求,可通过下列哪些途径:

A.外国法院

B.除驻华使领馆以外的其他驻华外国机关

C.驻华使领馆

D.外国公民

题型:单项选择题 A1型题

  A new eight-kilometer road is under construction that links the port area with motorway system. It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city. As part of the project, two four-kilometer road tunnels are being built below the central area of the city, one for traffic to the north and the other for the traffic to the south. The two tunnels are about 20 meters below the surface and are 12 meters wide, providing for two lanes of traffic in each direction. 

In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel. The lighting is at the top of the tunnel, practically at its highest point. There will also be electric signs at frequent intervals. They show traffic conditions ahead and can be seen clearly by drivers. The wall is made up of four main elements, which include a waterproofing covering and, on the inside of the tunnel, a concrete lining.

Each tunnel is roughly round and the lower part of the tunnel is somewhat flat. The surface of the road lies on the base, which is made of concrete and steel. The drainage system, just below the road surface on one side, removes any extra liquid, particularly water. In the event of fire, the fire main, which is made of steel, pipes water to many fire hydrant stations at regular intervals along the length of the tunnel. The fire main is at the side of the tunnel and at the level of the road surface. Other systems in the tunnel will include emergency phones.

小题1:Each of the tunnels under construction is _____.

A.eight kilometers long and twenty meters wide

B.eight kilometers long and six meters wide

C.four kilometers long and twenty meters wide

D.four kilometers long and six meters wide小题2:Which part of the tunnel in the diagram is used to pipe out extra water?

A. 1           B. 3            C. 5               D  6 

小题3:Driving in the tunnel, one can know the traffic conditions ahead through______.

A.the lights

B.the electric signs

C.the trucks and the cars

D. the emergency phones小题4:The passage is mainly about _____.

A.the construction of a road

B.the design of a road

C.the construction of two tunnels

D.the design of two tunnels

题型:单项选择题 A1型题

防火灭火要做到会()。

A、会报警

B、使用灭火器材

C、会扑救初期火灾

D、会组织人员疏散逃生

更多题库