The earned value technique is a commonly u

题型:单项选择题

问题:

The earned value technique is a commonly used method of performance measurement. It integrates project scope, schedule, and cost measures to help the project management team assess project performance. If a project’s Cost Performance Index(CPI=EV/AC) value less than 1.0, it means that______.

A.the cost savings for work completed

B.the project is ahead of its planned schedule

C.the cost overrun for work completed

D.less work was completed than was planned

考点:计算机软件水平考试中级系统集成项目管理工程师中级系统集成项目管理工程师上午试题
题型:单项选择题

下列实验中必须使用活细胞做实验材料的是[ ]

A.观察DNA和RNA在细胞中分布

B.制备细胞膜

C.生物组织中蛋白质的鉴定

D.线粒体的观察

题型:单项选择题

The snow storm left,      a lot of damage to this area.

A.caused

B.causing

C.to cause

D.to have caused

题型:单项选择题

After dinner he gave Mr. Richardson _______ ride to _______ Capital Airport.

A.the;a

B.a;the

C./;a

D./;the

题型:单项选择题

求tan260°+4sin30°cos45°的值.

题型:单项选择题

有一首农村的民谣:“过去是喊破嗓子打烂钟,出工最早九点钟。现在不用队长叫一声、上工天不明,收工点了灯”。民谣反映了[ ]

A.家庭联产承包责任制的实行

B.乡镇企业的崛起

C.农业合作化的深入开展

D.市场经济体制的建立

更多题库