尺寸公差大小可以为正、负或零。

题型:判断题

问题:

尺寸公差大小可以为正、负或零。

考点:高职试题对口专业考试河南省2010年对口升学考试机电与机制专业真题
题型:判断题

关于蛛网膜下腔出血患者的Hunt-Hess分级,叙述正确的是()

A.Ⅰ级:经常出现双侧巴宾斯基征阳性

B.Ⅰ级:颅脑CT经常显示蛛网膜下腔血肿

C.Ⅳ级:有昏迷和(或)偏瘫

D.Ⅳ级:大部分颅脑CT显示出血仅限于蛛网膜下腔

E.Ⅳ级和Ⅴ级:急性期颅脑CT可能正常

题型:判断题

水中游动最快的是旗鱼,速度可达108km/h;陆地上跑得最快的是猎豹,1s可跑40m;空中飞行得最快的是褐海燕,每分钟能飞5km。这三者的速度大小是[ ]

A、猎豹最快

B、旗鱼最快

C、褐海燕最快

D、三者一样快

题型:判断题

China's largest water diversion project may start supplying water to Shandong Province by 2007 and Beijing by 2010, an official confirmed Tuesday.

The worsening water shortage in the two areas, caused by decades of drought, may be alleviated with water from the mighty Yangtze River in the South which will be diverted into the parched North, he said.

The water diversion project consists of three 1,300-kilometre canals that will carry water from the Yangtze along the eastern, middle and western parts of the country.

Zhang Jiyao, director of the State Council's office in charge of the South-to-North Project, told a national conference that ground will be broken in more places along two of the lines of the ambitious water diversion scheme, the largest of its kind in the world.

Before next year's flood season, construction of four new sections along the two lines will push the project further along the fast track. That would bring the total sections under construction to 13, since construction started in 2002 with an estimated investment of 124 billion Yuan (about US$15 billion).

When finished, the two water diversion canals will be capable of transferring 13.4 billion cubic meters of water a year.

11.China's largest water diversion project is being constructed to__________.

A. supply water to Shandong Province.

B. remove the worsening water shortage in Beijing.

C. alleviate the shortage of water in the North.

D. break ground in more places.

12. From the whole passage we can infer that__________.

A. the water diversion project is the biggest in China, but not in the world.

B. the water diversion project is the largest both in China and in the world.

C. the project will cost 124 billion dollars.

D. the project will be finished by 2010.

13. When finished, ________.

A. the project will solve the water problem once and for all.

B. the project will supply 13.4 billion cubic meters of water a year.

C. the shortage of water in the North will be alleviated.

D. the drought in Beijing and Shandong province will disappear.

14. According to the passage, which one is true?

A. The shortage of water in the North is only because there are too many people.

B. The whole project will be completed by the year 2010.

C. The total sections under construction will be 13 till the whole project is finished.

D. The whole water diversion project is made up of three canals.

题型:判断题

诊断胫骨平台凹陷骨折时,最佳CT显示图像为()

A、轴位图像。

B、冠状未或矢状位MPR图像。

C、MIP重建图像。

D、VR重建图像。

E、最小密度投影图像。

题型:判断题

马思聪创作的小提琴作品是()()()()。

更多题库