在Word软件中按照要求绘制如下图所示的表格,用Word的保存功能直接存盘。 要求:

题型:问答题

问题:

在Word软件中按照要求绘制如下图所示的表格,用Word的保存功能直接存盘。

要求: 1.表格外框线为红色线条,内部均为蓝色线条,表格底纹设置为灰色-30%。 2.表格中的内容设置为宋体、五号、居中。 3.为“304教室、205教室、108教室”添加“礼花绽放”动态效果。 4.“备注:教学楼图片”上单元格插入一张合适的剪贴画。

考点:计算机软件水平考试初级信息处理技术员计算机水平考试初级信息处理技术员2007年上半年下午真题
题型:问答题

“皇帝”成为我国最高封建统治者的称谓,首创于

A.秦始皇 

B.汉武帝 

C.唐太宗 

D.宋太祖

题型:问答题

某住宅小区为多高层混合小区,在建设阶段甲物业管理公司早期介入了该工程,如果你是该物业管理公司的高级管理者,你应该从哪些方面为建设单位提供建议,方便今后的物业管理服务?在前期物业管理期间,会存在哪些工程质量保修责任,在保修期内,保修责任是谁?作为物业管理公司,你应该如何处理?

题型:问答题

China's largest water diversion project may start supplying water to Shandong Province by 2007 and Beijing by 2010, an official confirmed Tuesday.

The worsening water shortage in the two areas, caused by decades of drought, may be alleviated with water from the mighty Yangtze River in the South which will be diverted into the parched North, he said.

The water diversion project consists of three 1,300-kilometre canals that will carry water from the Yangtze along the eastern, middle and western parts of the country.

Zhang Jiyao, director of the State Council's office in charge of the South-to-North Project, told a national conference that ground will be broken in more places along two of the lines of the ambitious water diversion scheme, the largest of its kind in the world.

Before next year's flood season, construction of four new sections along the two lines will push the project further along the fast track. That would bring the total sections under construction to 13, since construction started in 2002 with an estimated investment of 124 billion Yuan (about US$15 billion).

When finished, the two water diversion canals will be capable of transferring 13.4 billion cubic meters of water a year.

11.China's largest water diversion project is being constructed to__________.

A. supply water to Shandong Province.

B. remove the worsening water shortage in Beijing.

C. alleviate the shortage of water in the North.

D. break ground in more places.

12. From the whole passage we can infer that__________.

A. the water diversion project is the biggest in China, but not in the world.

B. the water diversion project is the largest both in China and in the world.

C. the project will cost 124 billion dollars.

D. the project will be finished by 2010.

13. When finished, ________.

A. the project will solve the water problem once and for all.

B. the project will supply 13.4 billion cubic meters of water a year.

C. the shortage of water in the North will be alleviated.

D. the drought in Beijing and Shandong province will disappear.

14. According to the passage, which one is true?

A. The shortage of water in the North is only because there are too many people.

B. The whole project will be completed by the year 2010.

C. The total sections under construction will be 13 till the whole project is finished.

D. The whole water diversion project is made up of three canals.

题型:问答题

华托的《发舟西苔岛》

题型:问答题

水压试验工作是以停止给水,压力维持5min,下降不超过()MPa为合格的。

更多题库