某集团公司承担一项大型铁路工程。工程内容主要包括32公里新建双线铁路土建工程及全线1

题型:问答题

问题:

某集团公司承担一项大型铁路工程。工程内容主要包括32公里新建双线铁路土建工程及全线120双线公里的铺架工程。其中:接轨站有少量填方工程,具有现场制梁条件及设置铺轨基地条件;1#大桥下最大水深6.0米,覆盖层厚2.0~4.0米,桩基入岩,高桩承台顶与常水位平齐,施工期间不通航;l#隧道无不良地质,有增设横洞条件。此工程要求2006年10月1日动工,2007年9月1日开始铺架,2009年6月30日全线竣工。工程简图如下:

搜索

简述1#大桥水中墩桩基、承台施工技术方案。

考点:一级建造师铁路工程一级建造师铁路工程管理与实务真题2006年
题型:问答题

用所给动词的正确形式完成短文,并将答案依次填在短文后面相应的横线上。

     Once upon a time, there was a rich man. Each morning, the rich man found a poor man 1_____(sit) on

a bench in the park. The poor man always sat there, looking at the big hotel in which the rich man lived.

One day, the rich man  2_____(get) out of his car and said to the poor man,"Excuse me. I want 3_____(know) why you sit here and look at my hotel every morning." "Sir," said the poor man,"I am a failure. I 4_____(have)

no money, no family and no home. I sleep on this bench, and every night I dream that one day I will sleep in

that hotel." The rich man said," Tonight your dream 5_____(come) true. I'll pay for the best room in that hotel

for you a whole month."  

     A few days later, the rich man went into the poor man's room to ask him how he 6_____(feel) in it. To his

surprise, he found that the man 7_____(move) out of the hotel back to his bench. When the rich man asked

why, he said,"You see, while I 8_____(sleep) on my bench, I dream I am there in the big hotel. It's a wonderful

dream. But while I 9_____(be) there, I dreamed I was back to this cold bench. It was a terrible dream, and I

10_____(can not) get any sleep at all."  

题型:问答题

TCAS的英文全称为()。

A.Traffic alert and Collision Advoidance System

B.Traffic Collision and Alert System

C.Traffic Control and Service

D.Traffic Condition and Surveillance

题型:问答题

下列()不是三轴剪切试验与直剪试验相比所具有的优点。

A.应力条件明确 

B.剪切面固定 

C.分析原理严密 

D.可模拟各种排水条件和应力条件

题型:问答题

国办发[2006]50号规定,国土资源部向地方派驻( )个国家土地督察局。

A.6
B.8
C.9
D.10

题型:问答题

两台扬程不相等的泵串联工作时,应把()低的放在前面.

A.流嚣

B.功率

C.扬程

D.效率

更多题库