试述货物收益管理的过程。

题型:问答题

问题:

试述货物收益管理的过程。

考点:物流师考试高级物流师高级物流师
题型:问答题

I think Alice is the right person for the job, because she's always thinking         of it than of herself.[ ]

A. much    

B. more  

C. little    

D. less

题型:问答题

前台服务员在夜审打印报表时,需要打印两份、分别交给店长和财务的:《夜审综合统计报表()。

题型:问答题

句型转换。

1. There are over 60 students in his class. (改为同义句)  

    There are                                 60 students in his class.

2. They go to school on their bikes. (改为同义句)

    They                their bikes                                 .

3. It takes about three years to build the hospital. (对画线部分提问)  

                                                it take                build the hospita1?

4. Mary runs more slowly than the other students in her class. (改为同义句)

    Mary                                               in her class.

5. He often goes to school on foot. (改为同义句)  

    He often                                 school.

题型:问答题

D


Any mistake made in the printing of a stamp raises its value. A mistake on one inexpensive postage stamp has made the stamp worth a million and a half times its original (本来的) value. The mistake was made more than a hundred years ago in the British colony (殖民地)of Mauritius, a small island in the Indian Ocean. In 1847 an order for stamps was sent to a London printer—Mauritius was to become the fourth country in the world to issue (发行) stamps.
Before the order was delivered(传达), a party was planned at Mauritius’Government House, and stamps were needed to send out the invitations. A local printer was told to copy the design for the stamps. He printed the words " Post Office " instead of " Post Paid " by mistake on the several hundred stamps that he printed.
Today there are only twenty-six of these misprinted stamps left—fourteen Onepenny Orangereds and twelve Twopenny Blues. Because of the Twopenny Blue’s rareness (稀少) and age, collectors have paid as much as $ 16800 for it.

In 1847 most countries of the world were ______.

A.not yet using stamps

B.collecting valuable stamps

C.buying stamps for Mauritius

D.printing their own stamps

题型:问答题

已知网络计划中工作M有两项紧后工作,这两项紧后工作的最早开始时间分别为第11天和第13天,工作M的最早开始时间和最迟开始时间分别为第5天和第9天。如果工作M的持续时间为6天,则工作M()。

A.总时差为4天

B.自由时差为。天

C.总时差为2天

D.自由时差为2天

E.与紧后工作时间间隔分别为0天和2天