网络计划的表达方式是()A.横道图 B.工艺流程图 C.网络图

题型:单项选择题

问题:

网络计划的表达方式是()

A.横道图

B.工艺流程图

C.网络图

考点:建设工程质量、投资、进度控制第十六章网络计划技术第十六章网络计划技术题库
题型:单项选择题

根据对话内容,在空白处写出恰当的句子,使句子连贯完整。

John: Uncle Smith, this is John speaking. I'm sorry to call up so late, but may I speak to Jim?

Smith: Jim is out. 1_______

John: OK, please. Jim and I applied an adventure (冒险) tour competition on the Internet a week ago. 

Today I was told that we were accepted.

Smith: Oh, that must be dangerous. 2_______ 

John: Because we want to do sports and something exciting.

Smith: You'd better not. 3_______

John: Uncle Smith, don't worry. We can take good care of ourselves.

Smith: 4_______ 

John: Yes. We are ready for it.

Smith: Good luck.

John: 5_______

Smith: OK. I'll tell him to call you back later.

题型:单项选择题

从安全角度出发,一般规定触头法的开路电压不应超过()

A.220V;

B.6V;

C.36V;

D.24V

题型:单项选择题

华夏公司依据争议发生后与曙光公司达成的仲裁协议申请仲裁,请求责令曙光公司支付拖欠的货款。在仲裁程序中,华夏公司与曙光公司自愿达成和解协议后,华夏公司撤回仲裁申请。此后,华夏公司反悔。下列表述中哪一项是不正确的

A.华夏公司可以根据原仲裁协议重新申请仲裁

B.华夏公司可以根据与曙光公司重新达成的仲裁协议申请仲裁

C.华夏公司可以向人民法院起诉,曙光公司可以依据原仲裁协议对人民法院的管辖权提出异议

D.华夏公司可以向人民法院起诉,曙光公司不得依据原仲裁协议对人民法院的管辖权提出异议

题型:单项选择题

简要分析近年来我国居民消费需求不足的原因。

题型:单项选择题

在某段公路上,分别有图示的甲、乙两块告示牌,告示牌上面数字的意思是()

A.甲是指位移,乙是平均速度

B.甲是指路程,乙是平均速度

C.甲是指位移,乙是瞬时速度

D.甲是指路程,乙是瞬时速度

更多题库