非匀速进展横道图比较法绘制步骤为( )。 ①随着工作的进展,在横道线下方绘制粗实

题型:单项选择题

问题:

非匀速进展横道图比较法绘制步骤为( )。 ①随着工作的进展,在横道线下方绘制粗实线,从开始之日起至检查日期止。对此期间未工作的时间,以空白表示,由此可以得知工作的连续与间断情况; ②比较同一时刻计划完成任务量累计百分比与实际完成任务量累计百分比; ③在横道线下方,与第①步对应位置,标注各主要时刻工作的实际完成任务量累计百分比; ④绘制横道图进度计划,并在横道线上方标出各主要时刻工作的计划完成任务量累计百分比。

A.①②③④

B.②①③④

C.①②④③

D.①③②④

考点:设备监理师质量、投资、进度控制设备监理进度控制
题型:单项选择题

《中国保险监督管理委员会行政复议办法》规定,公民、法人或者其他组织认为保监会或其派出机构的具体行政行为侵犯其合法权益的,可以自知道具体行政行为之日起60日内提出行政复议申请。从公民的角度看,当其合法权益受到侵犯时应 [ ]

①依法自觉维护个人的正当利益

②制裁和惩罚侵犯自己权益的公民和法人

③依法行使公民的基本政治权利

④坚持个人利益和国家利益相结合的原则

A、①④

B、①③

C、②③

D、②④

题型:单项选择题
 阅读理解。
NEMSNEWRI Environmental Master of Science
NEWRI: Nanyang Environment & Water Research Institute
Be a leader in environmental science and engineering
through the NEMS programme
NEWRI Environmental Master of Science(NEMS) is a primary graduate education and research programme conducted by Nanyang Technological University's (NTU's) NEWRI, with summer attachment at Stanford University. It aims to train engineers and scientists to meet the increasing environmental challenges for Asia and the wider region.NEWRI-Nanyang Environment &
Water Research Institute
NEWRI is enabling Singapore to be a global center of environmental science and technology in providing technological solutions to the world. It is committed to environmental and water technologies through its ecosystem of education, research and developmental activities.
NEWRI is trying its best to pull together NTU's water and environment-related centres and institutes, gathering one another's strengths for the benefit of industry and society.
Master of Science Applications ● Applications open now and close on 30 May 2012 for Singapore applicants.  ● Graduates having relevant engineering or science background, including final-year students, are invited to apply.  ● Applicants are required to have a certificate of GRE.   Further information and application materials are available at the Website: http:// www. Cee.ntu.edu.sg/Graduate/NEMS
Scholarship for tuition grants and living expenses at both Stanford and NTU are available Enquiry contact:  Ms Christian Soh Tel:(65) 6861 0507    Fax:(65) 68614606 Email: nems@ntu.edu.sg    Information on other graduate programmes available at: www.ntu.edu.sg/cee/program/postgrad.aspHighlights of Programme:
     Students spend a full summer term at Stanford taking regular courses and continue with the rest of their academic programme at NTU.
     It is a 12-month full-time course in environmental science & engineering.
     Students under NEMS will have opportunities to do research projects under NEWRI as well as to continue for the Doctor's degree.
     Graduating students receive the NTU degree and a certificate from Stanford for their summer attachment.
1. If one wants to apply for the NEMS programme, it is essential for him to __________.
A. have passed the GRE test
B. make contact with Ms Soh  
C. possess a university diploma
D. major in engineering or science
2. Students admitted to the NEMS Programme __________.
A. will first have regular courses at Stanford
B. needn't be released from their regular jobs
C. are required to obtain a Doctor's degree
D. can receive degrees of both NTU and Stanford
3. What's the main purpose of the NEMS programme?
A. To offer scholarship for tuition grants and living expenses.
B. To strengthen the cooperation between NTU and Stanford.
C. To cultivate experts on environmental science and engineering.
D. To introduce Nanyang Environment & Water Research Institute.
题型:单项选择题

根据我国现行建设项目投资构成,下列费用项目中属于建设期利息包含内容的是( )。

A.建设单位建设期后发生的利息

B.施工单位建设期长期贷款利息

C.国内代理机构收取的贷款管理费

D.国外贷款机构收取的转贷费

题型:单项选择题

  据“国内个人捐款抽样问卷调查”表明:受过良好教育的人构成了个人捐款者群体的主体。其中大专占30.1%,本科以上占31.1%。每一万个大专以上学历的人中,有64.6人为希望工程捐过款,而每一万个小学以下学历的人,捐款不到0.05 。在接受调查的3 158名捐赠者中,公务员、企事业单位干部占40.2%,工人职员占21.1%。另一项调查显示:人均月收入介于300元和1 200元之间的低中等收入的占全部捐款者的61.5%。

如果捐款者有10000人,那么月收入介于300~1200元的低中收入者有多少人()

A.1 200

B.6 150

C.4 020

D.2 110

题型:单项选择题

背景


某工程项目部造价师在进行工程造价分析时,对其他直接费、现场经费和间接费做了如下分类:
(1)其他直接费
1)冬雨期施工增加费。
2)夜班津贴及有关照明设施等增加的费用。
3)职工探亲路费。
4)工地转移费。
(2)现场经费
1)临时设施费。
2)现场管理费。
3)行车干扰施工增加费。
4)现场施工辅助费。
(3)间接费
1)企业管理费。
2)财务费。
3)主副食运输补贴。
(4)费率计算方法
1)财务费用按工程类别和地区类别选用相应的费率。
2)计划利润按定额直接费与其他费率之和的一定费率计取。
3)工程质量监督费以定额直接费、其他直接费之和的一定费率计取。
[

问题

]

费率计算中哪些是正确的,哪些欠妥,欠妥的应该如何计算