当项目建设合同履行过程中发生争议时,无论是承建单位还是建设单位,都应以书面的形式向监

题型:单项选择题

问题:

当项目建设合同履行过程中发生争议时,无论是承建单位还是建设单位,都应以书面的形式向监理单位提出争议事宜,并呈一份副本给对方。错误的监理做法是 ( )。

A.及时了解合同争议的全部情况,包括进行调查和取证

B.及时进行调查和取证后,向合同约定的仲裁委员会申请仲裁

C.及时与合同争议的双方进行磋商,由总监工程师提出监理意见,进行调解

D.在调解期间,责成各方继续履行合同,保证实施工作的连续进行,保护好已完成的项目现状

考点:计算机软件水平考试中级信息系统监理师计算机水平考试中级信息系统监理师2005年上半年上午真题
题型:单项选择题

一列简谐横波在某一时刻的波形图如图甲所示,图中PQ两质点的横坐标分别为x1=1.5 m和x2=4.5 m.P点的振动图象如图乙所示.在下列四幅图中,Q点的振动图象可能是

 

 

[ ]

A.①②  

B.①③  

C.②③  

D.②④

题型:单项选择题

初三(1)班有48名学生,春游前,班长把全班学生对春游地点的意向绘制成了扇形统计图,其中“想去野生动物园的学生数”的扇形圆心角为120度.请你计算想去其他地点的学生有______人.

题型:单项选择题

关于正常心形描述不恰当的是( )

A.三角形心脏

B.小儿球形心

C.垂位心

D.斜位心

E.横位心

题型:单项选择题

阅读理解。

     More ice melted from the surface of the Greenland Ice Sheet this year than ever before recorded, report

scientists from the University of Colorado. The same team found that the extent of Arctic sea ice reached the

lowest level in the satellite record in 2002, offering further proof that climate change is already changing the

Arctic.

     Researchers from the University of Colorado (UC) say that the speeding up melting appears to be linked to

changes in Northern Hemisphere atmospheric circulation patterns. The study also found temperatures during

the summer of 2002 were warmer than usual over much of the Arctic Ocean.

     "It is likely that sea ice extent will continue to decline over the 21st century as the climate warms,"

researchers added. "With these trends, we may see a 20 percent reduction in the yearly average sea ice by

2050, and by then there might be no ice at all during the summer months."

     The report was released on Saturday at the yearly fall meeting of the American Geophysical Union, just one

week after an announcement by the National Aeronautics and Space Administration (NASA) that sea ice is

melting about nine percent faster than earlier research had showed, and could disappear entirely by the end of

this century.

     "This trend of disappearing Arctic sea ice is one example of the environmental damage that can be linked

to carbon dioxide emissions," said Morgan, "When we have the means to reduce CO2 emissions (散发) and

prevent further damage, we should do our best. National leaders must act now to improve energy efficiency

and increase the use of renewable energy sources, like wind and solar, before it's too late."

     UC scientists judge that a change in the Greenland climate toward warmer conditions would lead to an

increase in the rate of sea level rise, which will bring disasters to the human beings.

1. It can be inferred that _____. [ ]

A. scientists have found that Arctic sea ice is lower than before

A. scientists have studied the pictures of the Arctic sent by satellites

B. scientists began to do research on Arctic sea ice in the year 2002

C. warm temperature has hardly any effect on the extent of Arctic sea ice now but soon will

2. Scientists fear that _____. [ ]

A. there will be no ice left at all in the Arctic Ocean at the end of the 21st century

B. disasters will happen if Arctic sea ice continues to melt faster than before

C. the temperature in Greenland will be too warm for animals and human beings to live on

D. people still think Arctic sea ice is melting slowly

3. It is thought that _____. [ ]

A. carbon dioxide emissions are one of the causes of the environmental damage

B. carbon dioxide emissions are an example of the environmental damage

C. most environmental problems are caused by carbon dioxide emissions

D. people can still have the chance to solve the above environmental problem

题型:单项选择题

某施工单位(以下称乙方)与某建设单位(以下称甲方)签订一项工程施工合同,工程未投保。该项目在施工过程中,遭遇罕见洪水袭击,造成很大损失。在事件发生后,乙方在规定时间内按照规定程序提出索赔要求、索赔报告以及相关资料,索赔报告内容如下。
(1) 遭受罕见洪水袭击的风险不应由乙方承担,而应由甲方承担;
(2) 洪水造成乙方人员伤亡,丧葬费用、医疗费用以及各项补偿共计27.82万元,应由甲方承担;
(3) 乙方的施工机械受损共计6.5万元,应由甲方承担;
(4) 乙方现场停工损失共计3.4万元,应由甲方承担;
(5) 在建工程的已完工部分的损失共计人民币37.45万元,修复或重建的费用应由甲方全部承担;
(6) 现场清理费用共计2.7万元,应由甲方承担;
(7) 现场停工11天,工期应顺延11天。
[问题]1. 1.简述我国《建设工程施工合同(示范文本)》规定的施工索赔程序。
2.因不可抗力发生的风险承担的原则有哪些
3.乙方的索赔要求哪些成立,哪些不成立应如何处理(请逐条回答)

更多题库