已知x>0,P=1+x,Q=1+x2,则P与Q满足( ) A.P>Q B.P<Q C.

题型:选择题

问题:

已知x>0,P=
1+x
,Q=1+
x
2
,则P与Q满足(  )
A.P>QB.P<QC.P≥QD.不能确定
考点:不等式的定义及性质
题型:选择题

高钙血症是指血清总钙超过()。

A.1.10mmol/L

B.1.34mmol/L

C.2.25mmol/L

D.2.58mmol/L

E.3.58mmol/L

题型:选择题

留置权成立的条件

题型:选择题

蟾酥为蟾蜍科动物()或黑眶蟾蜍之耳后腺及皮肤腺的干燥分泌物。

题型:选择题

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(4)处应选择()

A.parts

B.modules

C.software

D.awhole

题型:选择题

10月12日至13日,李克强出席2016年全国大众创业万众创新活动周,()是实施创新驱动发展战略的重要抓手,是推进供给侧结构性改革的重要体现,是培育新动能的有力支撑。

A.“农村电商”

B.“异地创业”

C.“创新创业”

D.“共享经济”

更多题库