I was always told that the three Ps, patience, positive thinking and perseverance(毅力), were a sure path  小题1:  success. But this advice does not always work as planned. My high school maths exam is one example. The exam,   小题2:   was originally to be held in our classroom, 小题3: (change) to the library at the last minute. This,  小题4: ,didn’t bother me because maths had always been my strongest subject. I patiently walked to the library, took my seat and did some deep breathing to help relax  小题5:  . But my mood quickly changed when I saw  小题6:  first question. I had no idea how to do it. I tried to stay positive and persevered  小题7:  I finally found the solution. With the problem  小题8: (solve), I felt proud of my achievement. 小题9: (fortunate), I then noticed that I had just 10 minutes left  小题10: (complete) the rest.

考点:序数词
题型:完形填空

甲公司投资建设一幢地下1层、地上5层的框架结构商场工程,乙施工企业中标后,双方采用《建设工程施工合同》(示范文本)(GF-1999-0201)签订了合同。合同采用固定总价承包方式,合同工期为405d,并约定提前或逾期竣工的奖罚标准为每天5万元。合同履行中出现了以下事件:事件1:乙方施工至首层框架柱钢筋绑扎时,甲方书面通知将首层及以上各层由原设计层高4.30m变更为4.80m,当日乙方停工。25d后甲方才提供正式变更图纸,工程恢复施工。复工当日乙方立即提出停窝工损失150万元和顺延工期25d的书面报告及相关索赔资料,但甲方收到后始终未予答复。事件2:在工程装修阶段,乙方收到了经甲方确认的设计变更文件,调整了部分装修材料的品种和档次。乙方在施工完毕3个月后的结算中申报了该项设计变更增加费80万元,但遭到甲方的拒绝。事件3:从甲方下达开工令起至竣工验收合格止,本工程历时425d。甲方以乙方逾期竣工为由从应付款中扣减了违约金100万元。乙方认为逾期竣工的责任在于甲方。

事件2中,乙方申报设计变更增加费是否符合约定?结合合同变更条款说明理由。

题型:完形填空

教案也叫( )

A.单元计划

B.课题计划

C. 课时计划

D.学期计划

题型:完形填空

麻子仁丸的主治证候中有()

A.大便稀溏

B.腰膝痠软

C.小便频数

D.久痢赤白

E.手足厥逆

题型:完形填空

税收法律责任中的经济责任主要有()。

A、补缴税款

B、加收滞纳金

C、吊销税务登记证

D、罚款

题型:完形填空

铁口维护有哪些主要技术措施?

更多题库