下列选项中,不属于工程建设项目从技术层面考虑标段的划分因素的是()。A.工程技术关联

题型:单项选择题

问题:

下列选项中,不属于工程建设项目从技术层面考虑标段的划分因素的是()。

A.工程技术关联性

B.工程管理的关联性

C.工程计量的关联性

D.工作界面的关联性

考点:招标采购专业实务招标采购专业实务题库
题型:单项选择题

神经纤维瘤病发生过程中,相对应的特异的主要相关抑癌基因表达产物异常的是()

A.BRCA1

B.APC

C.p16

D.p53

E.NF1

题型:单项选择题

转化率Z、选择性X、单程收率S的关系是()。

A、Z=XS

B、X=ZS

C、S=ZX

D、以上关系都不是

题型:单项选择题

字符函数String(2,"abcdef")返回的值是 ______。

A."aa"

B."AA"

C."ab"

D."AB"

题型:单项选择题

The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (46) of the technical requirements for the software product.
During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each (47) that it must meet. The starting point is usually a set of high-level requirements from the (48) that describe the project or problem.
In either case, the requirements definition team formulates an overall concept for the system and then defines (49) showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review (SCR).
Following the SCR, the team derives (50) requirements for the system from the high-level requirements and the system and operations concept. Using structured or object-oriented analysis the team specifies the software functions and algorithms needed to satisfy each detailed requirement.

A.criterion

B.standard

C.scenarios

D.system

题型:单项选择题

简答“仿制贝”出现的原因和意义。

更多题库