阅读短文,判断正(T)误(F)。 Mr and Mrs Wilson and

题型:阅读理解

问题:

阅读短文,判断正(T)误(F)。

     Mr and Mrs Wilson and their children were going to begin their holiday one day, and they must be at

 the airport at eleven forty in the morning. "It will take us half an hour to get there in the car, "Mr Wisson

 said. "So we must get there before eleven o'clock. Don't be late."

     At ten minutes to eleven, they were busy doing things, but Mrs Wilson didn't. She was sitting quietly

 in a chair in the garden, enjoying the sun.

     Her husband and children were very surprised. Why wasn't she busy too? Mrs Wilson answered,

 "Well, before I went to bed last night, I moved all our clocks and watches ahead (提前) twenty minutes.

 So now we can go to the airport quietly without worrying about being late."

( ) 1. The Wilson family had to be ready by 11:00, because they had to go to a town.

(     ) 2. At ten fifty, Mr Wilson and the children were all very busy.

(     ) 3. And at ten fifty Mrs Wilson was quite busy doing things.

(     ) 4. Mrs Wilson moved all clocks and watches ahead twenty minutes.

(     ) 5. Mr Wilson and the children were angry that Mrs Wilson wasn't busy.

考点:故事类阅读
题型:阅读理解

劳动教养不适用于不满16周岁的人。 ( )

题型:阅读理解

判断视网膜色素上皮功能常用的临床电生理检查方法为()

A.EOG

B.VEP

C.ERG

D.N、C、T

E.OCT

题型:阅读理解

该分行为了控制在当地贷款中的信用风险,可以采取的方法是( )。

A.进行持续期管理

B.对借款人进行信用的“5C”、“3C”分析

C.建立审贷分离机制

D.保持负债的流动性

题型:阅读理解

《建设工程想质量管理条例》中要求,施工单位向建设单位提交《工程质量保修书》的时间是()。

A、工程竣工验收合格后

B、工程竣工同时

C、提交工程竣工验收报告时

D、工程竣工结算后

题型:阅读理解

工程设计、筹资融资、对外谈判、招标投标、签订合同、征地拆迁及移民安置、施工准备(场地平整、通路、通水、通电等)是投资项目( )的主要工作。

A.前期阶段

B.准备阶段

C.实施阶段

D.运营阶段

更多题库